* Opportunity to respond with parameter equipment without any other equipments.
* In order to operate different hydrolic and speed controls, seperated interface cards are placed on the CPU card.
* Entegrated security circuit to pre-door opening and draw the cabin to the floor. Satisfies the EN81 standarts.
* Easy installation with safety connections, sockets and relays.
* Encoder connections for the sensitiveness of the installation of the shaft.
* Opportunity to save the operation datas when the electricity is gone.
* Free programmable inputs and outputs to give flexibility.
* Counters for the door actions,travelling and running hours.
* Serial connection points in order to transfer the operation and error datas to the inspection center.
* Shaft installation without magnetism with the help of digital shaft installation.
* Automated speed and stop distances according to the distance between the floors |
* Easy access to the parameter adjustments and error datas with serial connections to the laptops and printers
* Serial connections in order to have remote inspection with modem and telephone network.
* Have electromagnetic test successes in Siemens-EMV-Centre.
* Compatibility with modem.
* Opportunity to inspect the latest 500 actions.
* Error itemzing with printer or ables to have the print out of the all adjustments.
* No need to have additional panel in order to run as double or triplex.
* Entegrated secure circuit for the bridiging door and lock contacts to cancel the out records and door operations.
* With TUV , URA and EN81 certifications and special door open command satisfies then Europen Standards.
|